Where we operate

The project aims to be a replicable and scalable model at an international level, with its first implementation area in Botswana.

PHASE 1

 

Pilot Phase: 5 centers in the Ghanzi District, Botswana

Main Objective:
-To validate the integrated educational model under real conditions and refine methodologies.

Specific Goals:

-5 operational educational centers
-Training of local teachers
-Installed clean drinking water systems
-Implemented nutrition programs

Key Indicators:

-70% coverage of preschool-aged children
-40% improvement in basic skills

100% de niños con acceso a agua potable

PHASE 2

District Expansion (Years 4–8)

Location: Entire Ghanzi District, Botswana

Main Objective:
To consolidate the model and expand coverage across the entire district.

Specific Goals:

-20 additional centers (25 in total)
-Trained teachers
-Established school health network
-Strengthened community partnerships

Key Indicators:

-Full preschool coverage in the district
-30% reduction in primary school dropout rates
-90% of families actively participating

PHASE 3

Internationalization (Years 9–11)

Location: 3 countries in Africa and Latin America

Main Objective:
To replicate the proven model in new international contexts.

Specific Goals:

-30 centers across 3 countries
-Global network of trained teachers
-Model adapted to different cultural contexts
-Consolidated international partnerships

Key Indicators:

-Successful implementation in 3 different cultural contexts
-80% local financial sustainability in each country
-Creation of an international educational exchange network

TRANSFORMATIVE RESULTS

By 2035 we will have achieved:

-2,750 children with strong educational foundations
-200 educators trained in inclusive methodologies
-55 communities with guaranteed access to clean drinking water
-Nutrition programs impacting 5,000+ people
-1 replicable model for early childhood education in vulnerable contexts

NEXT IMMEDIATE STEPS

Would you like to learn more about any specific phase? Contact us!!!

2026:

-Signing of strategic partnerships
-Detailed design of pilot centers
-Selection and training of the initial team
-Construction of 2 centers

2027:

-Construction of the next 5 centers
-Implementation of pilot programs
-First impact evaluation